Plans, Permits & Building Codes in the Caribbean
A building permit is not paperwork to deal with after the design is finished. Approval requirements affect where the house can sit, how drainage and sewage are handled, which drawings are required and who must sign them. Starting work first can create stop notices, redesign and expensive demolition.

A practical approval sequence
- Confirm ownership, boundaries and planning status. Do this before paying for a final house design.
- Check site constraints. Setbacks, access, drainage, flood or coastal restrictions, sewage disposal and special environmental referrals can alter the usable building area.
- Prepare the required plans. Common items include site/location, floor, foundation, roof, elevations/sections, structural details, plumbing/sewage, drainage and electrical drawings.
- Submit through the responsible authority. Some islands now use online portals; others involve municipal/parish offices and referral agencies.
- Do not build from unstamped drafts. Keep approved drawings and the permit available on site.
- Request required inspections. Approval at the beginning does not replace inspections during construction.
- Control changes. Structural or geometric changes may require revised approval before they are built.
- Obtain completion/compliance documentation. This can matter later for insurance, financing, sale and legal occupation.
Three useful official starting points
| Country | Official system | What it demonstrates |
|---|---|---|
| Trinidad & Tobago | DevelopTT | Online processing for planning permissions, building permits, completion certificates and related development approvals. |
| Barbados | Planning and Development Department / ePortal | Online formal and chattel-house applications, plans, building-start certificates and certificates of compliance. |
| Jamaica | Local Authorities development guide | Detailed lists of plans and site information, including foundation, roof, sewage and stormwater drainage details. |
Your approval pack should answer these questions
Where exactly?
- Survey boundaries and dimensions
- Setbacks
- Road access and parking
- Existing and proposed ground levels
- Nearby drains/watercourses
What exactly?
- Floor area and use
- Foundation system
- Wall and roof construction
- Electrical and plumbing layout
- Wastewater and stormwater route
Why approval can save money
A good approval process forces decisions that are easy to postpone: where the septic system fits, whether drainage can leave the site legally, whether the house is too close to a boundary, whether an extension is possible and whether the structural system suits the site. Resolving these on paper is cheaper than resolving them after concrete has been poured.
- CDEMA Build Safe – CRCP 10:2023
- Trinidad & Tobago – DevelopTT
- Barbados – Planning and Development Department
- Jamaica – Development Application Process Guide
These links are examples and do not cover every Caribbean jurisdiction. Requirements can change and should be checked before submission.